Search scope:
排序: Display mode:
The “Tiangong” Chinese Space Station project
Yang HONG
Frontiers of Engineering Management 2018, Volume 5, Issue 2, Pages 278-283 doi: 10.15302/J-FEM-2018202
Keywords: manned space station space station project basic design
Key technical innovations in the construction of Baihetan Hydropower Station Project
Frontiers of Engineering Management 2023, Volume 10, Issue 2, Pages 367-372 doi: 10.1007/s42524-023-0253-5
Keywords: ultra-high arch dam columnar jointed basalt low-heat cement concrete temperature controlled crack prevention million-kilowatt unit intelligent construction
Zhao Yong,Han Fuzhong,Li Jianhua
Strategic Study of CAE 2010, Volume 12, Issue 12, Pages 23-28
Through the detailed risk evaluation on underground diameter projectfrom Beijing railway station to Beijing railway west station, the conditions of all the risk sources
Keywords: tunnel risk analysis risk control
Chinese space exploration and scientific motivation
Wu Ji
Strategic Study of CAE 2008, Volume 10, Issue 6, Pages 23-27
Keywords: China’s space exploration China-Russia joint Mars exploration project Kuafu project magnetosphere-ionishper-thermosphereexploration project solar polar orbit radio telescope
Qian Xuesen and China's Space Undertakings
Zhao Shaokui
Strategic Study of CAE 2001, Volume 3, Issue 8, Pages 7-14
Keywords: space science and technology macroscopic design technique decision organization management the project
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 102-107
Keywords: Three Gorges Project ship lift tower column deformation monitoring total station polar coordinate
Sina AMIRI; Ali Naghi DEHGHAN
Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 6, Pages 704-717 doi: 10.1007/s11709-021-0746-4
Keywords: shallow tunneling method pile and rib method ground surface settlement subway station construction
Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century
黄新生
Strategic Study of CAE 1999, Volume 1, Issue 1, Pages 86-86
Understanding the demand predictability of bike share systems: A station-level analysis
Frontiers of Engineering Management Pages 551-565 doi: 10.1007/s42524-023-0279-8
Keywords: bike share systems demand prediction prediction errors machine learning entropy
A Technical Review of Hydro-Project Development in China
Jinsheng Jia
Engineering 2016, Volume 2, Issue 3, Pages 302-312 doi: 10.1016/J.ENG.2016.03.008
This paper summarizes the development of hydro-projects in China, blended with an international perspective. It expounds major technical progress toward ensuring the safe construction of high dams and river harnessing, and covers the theorization of uneven non-equilibrium sediment transport, inter-basin water diversion, giant hydro-generator units, pumped storage power stations, underground caverns, ecological protection, and so on.
Keywords: Dam River harnessing Water diversion Pumped storage power station Underground cavern Ecological protection
Wang Shougen
Strategic Study of CAE 2004, Volume 6, Issue 7, Pages 88-93
The dam of Qiaoqi Hydropower Project is 123m high, in which it is the first time for the spreading
Keywords: Qiaoqi Hydropower Project spreading gradation crushed stones and earth impervious material engineering
Wang Shougen
Strategic Study of CAE 2005, Volume 7, Issue 3, Pages 78-83
The abutment is the part where the by-pass seepage and contact erosion often happen to make the dam not work normally, which is the key point during design and construction, so Design Specifications for Rolled Earth-Rock Fill Dams (SL274-2001) require excavating into the slightly weathered rock mass for the core wall and the reversed filter and the abutment. The spreading gradation earth-rock fill dam with crushed-stone-earth core wall is 123m high, and the highly weathering natural depth of the phyllite and sandstone at abutments on both bank is 14.6~66.4m. According to the Specification, the excavation quantity is enormous. It is practically excavated into the highly weathering zone, which can not meet with the Specification. The treatment scheme for the highly weathering rock mass on both abutments and grouting tests and grouting technics are introduced in detail. The feasibility to adopt consolidation grouting and seepage treatment measures is argued and the treatment measures and construction control standards are proposed.
Keywords: Qiaoqi Hydropower Station earth-rock dam treatment of abutment highly weathered rock mass consolidation
Seismic responses of subway station with different distributions of soft soil in Tianjin
Dejian YANG,Meiling DUAN
Frontiers of Structural and Civil Engineering 2014, Volume 8, Issue 2, Pages 187-193 doi: 10.1007/s11709-014-0252-z
Keywords: distribution of soft soil soft soil in Tianjin seismic response ANSYS
Title Author Date Type Operation
Key technical innovations in the construction of Baihetan Hydropower Station Project
Journal Article
China’s space station
20 Dec 2023
Conference Videos
Analysis and control of significant risk source of underground diameter project from Beijing railwaystation to Beijing railway west station
Zhao Yong,Han Fuzhong,Li Jianhua
Journal Article
China’s space station(English)
16 Jan 2024
Conference Videos
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Journal Article
Comparison of shallow tunneling method with pile and rib method for construction of subway station in
Sina AMIRI; Ali Naghi DEHGHAN
Journal Article
Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century
黄新生
Journal Article
Understanding the demand predictability of bike share systems: A station-level analysis
Journal Article
and Design of the Crushed Stones and Earth as Impervious Material for the Dam in Qiaoqi Hydropower Station
Wang Shougen
Journal Article
Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project
Wang Shougen
Journal Article